Skip to main content

Ontario · CSA Z769 & O.Reg. 153/04

Phase 2 Environmental Site Assessment in Simcoe County

Ben Engineering offers Phase 2 Environmental Site Assessment (ESA) consulting in Simcoe County, Ontario — with intrusive sampling and laboratory analysis under CSA Z769 and O.Reg. 153/04.

Standard
CSA Z769financing & due diligence
Regulation
O.Reg. 153/04RSC, rezoning, permits
Prepared by
Licensed P.Eng & P.Geo30+ years experience
Service area
Simcoe County, ONand Southwestern Ontario

What is a Phase 2 Environmental Site Assessment?

A Phase 2 ESA is an intrusive investigation involving borehole drilling, soil and groundwater sampling, and laboratory analysis, typically conducted after a Phase 1 ESA identifies Recognized Environmental Conditions.

See our Phase 1 ESA overview for more. In Ontario, Phase 2 ESAs may follow CSA Z769 (financing, due diligence) or O.Reg. 153/04 (RSC filing, rezoning, MECP applications).

Industrial and Commercial Context in Simcoe County

Simcoe County's industrial base is distributed across its member municipalities, with concentrations in Barrie, Collingwood, and Bradford, reflecting a mix of manufacturing, agriculture-support, and tourism-related industry.

Multi-Residential Development in Simcoe County

Multi-residential development varies significantly by municipality within the county, with the largest concentrations of apartment and condominium buildings found in Barrie and Orillia. Properties near these commercial and industrial corridors are the ones most likely to require environmental due diligence before financing, redevelopment, or a change of use.

Why This Matters for Properties in Simcoe County

The redevelopment pressure on Simcoe County's older commercial and industrial land — a pattern seen across much of Ontario as municipalities intensify around transit and existing infrastructure — means environmental due diligence is an increasingly routine step in local development approvals.

How a Phase 2 ESA Is Actually Carried Out

WATER TABLE MW-2 MW-1 ACCREDITED LAB

Laboratory results are compared against the applicable Ministry of the Environment, Conservation and Parks site condition standards for the property's actual and intended use, and any exceedances are clearly flagged in the final report along with recommended next steps.

Soil samples are collected at multiple depths from each borehole and screened in the field before being sent to an accredited laboratory, allowing the assessor to prioritize which samples warrant full laboratory analysis.

Environmental Site Assessment — Overview

Environmental Site Assessment overview video thumbnail

Environmental Site Assessment — Watch Video

Nearby areas we serve

Also servicing the surrounding region