Phase 2 Environmental Site Assessments in Orangeville

Our Phase 2 Environmental Site Assessment work in Orangeville use intrusive sampling — boreholes, monitoring wells, lab analysis — to confirm what a Phase 1 flags.

Orangeville, Ontario. View larger map
Ontariothe area this location sits in
~56 kmfrom our Vaughan head office
P.Eng & P.Geosealed by both, where required
Fixed pricequoted for a defined scope

Phase 2 Environmental Site Assessments in Orangeville

For transactions and due diligence, CSA Z769 is the usual standard; O. Reg. 153/04 governs work feeding into an RSC filing or a permit application.

Orangeville properties needing confirmation come to us for Phase 2 Environmental Site Assessments through on-site drilling, soil and groundwater sampling, and laboratory confirmation of what's actually present. Our Vaughan head office is roughly 56 km away, which keeps site visits simple rather than a line item on the invoice.

The Phase 2 ESA page explains the process and the report in full.

A Phase 2 usually follows a Phase 1 — see our Phase 1 ESA page for Orangeville if that step hasn't happened yet.

What triggers a Phase 2 ESA

A documented history of any of these usually points to a Phase 2.

Dry cleaningA documented history of dry cleaning on or near the site is one of the most common triggers for a Phase 2.
Auto repair or fuel serviceAutomotive and gas station uses carry a real likelihood of soil or groundwater impact.
Manufacturing or industrial useFormer manufacturing sites often carry a legacy of contamination worth confirming.
Storage tanksAbove or underground storage tanks, present or historic, are a frequent reason for sampling.

Nearby areas we serve

Ontario-wide coverage, generally within about 500 km of our Vaughan head office.

Common questions

Phase 2 Environmental Site Assessments in Orangeville

How long does a Phase 2 ESA take in Orangeville?

Three to six weeks is typical, depending on site access for drilling and how long lab results take.

How much does a Phase 2 ESA cost in Orangeville?

The number of boreholes, the lab analysis needed and site access all factor into cost. We quote a fixed price for a defined scope before we start.

Which standard applies?

For transactions and due diligence, CSA Z769 is the usual standard; O. Reg. 153/04 governs work feeding into an RSC filing or a permit application.

Does a Phase 2 always follow a Phase 1?

In most cases yes, since a Phase 2 confirms a Phase 1's findings — though a known issue, such as a documented spill, can justify going straight to Phase 2.

Need a Phase 2 ESA in Orangeville?

Share the property address and the Phase 1 findings, and we'll confirm scope and follow up with a fixed quote.