Skip to main content

Peel Region · Ontario

Phase 2 Environmental Site Assessments in Mississauga

Our Phase 2 Environmental Site Assessment work in Mississauga confirm or rule out contamination through drilling, sampling and laboratory testing.

Mississauga, Peel Region. View larger map
Peel Regionthe area this location sits in
~30 kmfrom our Vaughan head office
P.Eng & P.Geosealed by both, where required
Fixed pricequoted for a defined scope

Phase 2 Environmental Site Assessments in Mississauga

For transactions and due diligence, CSA Z769 is the usual standard; O. Reg. 153/04 governs work feeding into an RSC filing or a permit application.

Phase 2 ESAs for Mississauga properties are handled here with boreholes, monitoring wells and laboratory testing to confirm or rule out contamination flagged in a Phase 1. Because our Vaughan head office is about 30 km from Mississauga, getting to site doesn't add cost or delay.

For the complete process and report structure, see the Phase 2 ESA page.

A Phase 2 usually follows a Phase 1 — see our Phase 1 ESA page for Mississauga if that step hasn't happened yet.

What triggers a Phase 2 ESA

A documented history of any of these usually points to a Phase 2.

Dry cleaningA documented history of dry cleaning on or near the site is one of the most common triggers for a Phase 2.
Auto repair or fuel serviceAutomotive and gas station uses carry a real likelihood of soil or groundwater impact.
Manufacturing or industrial useFormer manufacturing sites often carry a legacy of contamination worth confirming.
Storage tanksAbove or underground storage tanks, present or historic, are a frequent reason for sampling.

Nearby areas we serve

We serve Ontario broadly, usually within 500 km of our Vaughan office.

Common questions

Phase 2 Environmental Site Assessments in Mississauga

How long does a Phase 2 ESA take in Mississauga?

Typically three to six weeks from engagement, depending on drilling access, lab turnaround and the number of sample locations.

How much does a Phase 2 ESA cost in Mississauga?

The number of boreholes, the lab analysis needed and site access all factor into cost. We quote a fixed price for a defined scope before we start.

Which standard applies?

For transactions and due diligence, CSA Z769 is the usual standard; O. Reg. 153/04 governs work feeding into an RSC filing or a permit application.

Does a Phase 2 always follow a Phase 1?

Usually, yes — a Phase 2 exists to confirm what a Phase 1 flags, but it can stand alone if a specific concern, like a known spill, is already documented.

Need a Phase 2 ESA in Mississauga?

Tell us the address and what the Phase 1 flagged, and we'll confirm the sampling scope and reply with a fixed quote.