Phase 2 Environmental Site Assessments in Peel Region

Phase 2 ESAs for Peel Region properties confirm or rule out contamination through drilling, sampling and laboratory testing.

Peel Region, Peel Region. View larger map
Peel Regionthe area this location sits in
~31 kmfrom our Vaughan head office
P.Eng & P.Geosealed by both, where required
Fixed pricequoted for a defined scope

Phase 2 Environmental Site Assessments in Peel Region

For transactions and due diligence, CSA Z769 is the usual standard; O. Reg. 153/04 governs work feeding into an RSC filing or a permit application.

Peel Region properties needing confirmation come to us for Phase 2 Environmental Site Assessments using intrusive drilling, sampling and lab analysis to confirm what a Phase 1 review has flagged. We work from our Vaughan head office, roughly 31 km away, so site attendance is straightforward rather than an added cost.

The Phase 2 ESA page explains the process and the report in full.

A Phase 2 usually follows a Phase 1 — see our Phase 1 ESA page for Peel Region if that step hasn't happened yet.

What triggers a Phase 2 ESA

A documented history of any of these usually points to a Phase 2.

Underground storage tanksPresent or historic USTs are one of the most common reasons a Phase 2 is recommended.
Dry cleaning historySites with a documented dry cleaning history carry a real likelihood of solvent contamination.
Vehicle service or fuel salesA history of auto repair or fuel retailing points strongly toward soil or groundwater impact.
Industrial or manufacturing useLegacy industrial operations often leave contamination worth confirming before it's relied on.

Nearby areas we serve

We serve Ontario broadly, usually within 500 km of our Vaughan office.

Common questions

Phase 2 Environmental Site Assessments in Peel Region

How long does a Phase 2 ESA take in Peel Region?

Typically three to six weeks from engagement, depending on drilling access, lab turnaround and the number of sample locations.

How much does a Phase 2 ESA cost in Peel Region?

Cost is driven by the number of sample locations, lab work required, and site access, priced to a defined scope before work begins.

Which standard applies?

For transactions and due diligence, CSA Z769 is the usual standard; O. Reg. 153/04 governs work feeding into an RSC filing or a permit application.

Does a Phase 2 always follow a Phase 1?

Typically yes — the point of a Phase 2 is to confirm a Phase 1's findings, though a documented issue like a known spill can skip straight to it.

Need a Phase 2 ESA in Peel Region?

Send the address and the Phase 1 findings, and we'll confirm scope and come back with a fixed quote.