Skip to main content

Who Can Prepare a BC Depreciation Report — The Qualified Person Rules

27 October 2025  ·  Depreciation Reports  ·  5 min read

British Columbia now restricts who may prepare a depreciation report. A strata council that engages someone outside the qualified categories ends up with a document that does not satisfy the Strata Property Act — and pays twice.

What changed

Until recently a strata council could engage more or less anyone it considered competent to prepare a depreciation report. From 1 July 2025 that discretion ended: the report must be prepared by a person falling within a defined set of professional categories.

On 27 October 2025 the Province widened that list, adding professional licensees in engineering, architectural technologists and certified technicians. The expansion was a practical response to demand — with the July 2026 deadline approaching, there were not enough qualified providers to go round.

Why the rule exists

A depreciation report is a thirty-year financial projection resting on engineering judgment about how long components will last and what replacing them will cost. Get the remaining service life of a roof or a parkade membrane wrong and the funding model is wrong with it. The qualification requirement is the Province's attempt to put a floor under report quality.

What a council should ask

  • Which qualified category does the person preparing the report fall into, and can they evidence it?
  • Is that person the one attending the site, or is the visit delegated to someone junior with the qualified professional only signing?
  • Does the fee include all three funding models the regulation requires, or are extra models charged separately?
  • What will the five-year update cost? A low first-report price sometimes anticipates an expensive update.

The practical risk

Cost matters to every council, but the cheapest quote is not a saving if the resulting report is not compliant. A non-compliant report means commissioning a second one, and by then the deadline may be closer than the lead time. Confirming qualifications at the proposal stage takes one email.

Need a depreciation report from a P.Eng?

We prepare depreciation reports for strata corporations across BC, sealed by a licensed Professional Engineer.

Request a Quote
About this article Written by Ben Engineering, which prepares reserve fund studies, depreciation reports, property condition assessments and environmental site assessments in Ontario and British Columbia. This is general information about regulatory and standards changes, not advice for a specific property. Requirements change — confirm the current position before acting.