Phase 2 Environmental Site Assessments in Barrie

For properties in Barrie, our Phase 2 ESAs rely on on-site drilling and laboratory analysis to confirm what a Phase 1 has identified.

Barrie, Simcoe County. View larger map
Simcoe Countythe area this location sits in
~69 kmfrom our Vaughan head office
P.Eng & P.Geosealed by both, where required
Fixed pricequoted for a defined scope

Phase 2 Environmental Site Assessments in Barrie

CSA Z769 generally covers transaction-driven work, while O. Reg. 153/04 applies to RSC filings, rezonings and municipal applications.

Phase 2 ESAs for Barrie properties are handled here through on-site drilling, soil and groundwater sampling, and laboratory confirmation of what's actually present. We work from our Vaughan head office, some 69 km distant, so site attendance is straightforward rather than an added cost.

The Phase 2 ESA page covers the full process and what the report contains.

A Phase 2 usually follows a Phase 1 — see our Phase 1 ESA page for Barrie if that step hasn't happened yet.

What triggers a Phase 2 ESA

A documented history of any of these usually points to a Phase 2.

Dry cleaningA documented history of dry cleaning on or near the site is one of the most common triggers for a Phase 2.
Auto repair or fuel serviceAutomotive and gas station uses carry a real likelihood of soil or groundwater impact.
Manufacturing or industrial useFormer manufacturing sites often carry a legacy of contamination worth confirming.
Storage tanksAbove or underground storage tanks, present or historic, are a frequent reason for sampling.

Nearby areas we serve

Ontario is our territory, generally staying within 500 km of the Vaughan head office.

Common questions

Phase 2 Environmental Site Assessments in Barrie

How long does a Phase 2 ESA take in Barrie?

Typically three to six weeks from engagement, depending on drilling access, lab turnaround and the number of sample locations.

How much does a Phase 2 ESA cost in Barrie?

Cost is driven by the number of sample locations, lab work required, and site access, priced to a defined scope before work begins.

Which standard applies?

CSA Z769 generally covers transaction-driven work, while O. Reg. 153/04 applies to RSC filings, rezonings and municipal applications.

Does a Phase 2 always follow a Phase 1?

In most cases yes, since a Phase 2 confirms a Phase 1's findings — though a known issue, such as a documented spill, can justify going straight to Phase 2.

Need a Phase 2 ESA in Barrie?

Share the property address and the Phase 1 findings, and we'll confirm scope and follow up with a fixed quote.