Skip to main content

ASTM E2018-24: What Changed in the Property Condition Assessment Standard

1 January 2024  ·  Property Condition Assessments  ·  5 min read

ASTM E2018-24 took effect on 1 January 2024, replacing the 2015 edition that the industry had relied on for nearly a decade. The revision runs to more than 140 changes, and the theme running through them is the user.

The user moves to the centre

The most consequential change is philosophical. The revised guide expects a conversation between the user and the consultant before the assessment begins, so the scope reflects what the user actually needs to decide. A purchaser weighing a ten-year hold, a lender underwriting a five-year mortgage and an owner planning capital works are not asking the same question, and the standard now acknowledges that.

In practice this means a PCA proposal should ask what the report is for. If nobody asks, the report is being produced to a template.

Clearer boundaries on what gets reported

The revision tightens definitions, notably around what constitutes a material physical deficiency as against routine maintenance. That distinction matters commercially: it shapes what appears in the cost tables a lender reads, and it reduces argument about whether an item belongs in the report at all.

Specialists and high-cost systems

The guide gives more attention to when a specialist should be brought in for high-cost or critical building systems, rather than the generalist assessor forming a view alone. For a large parkade, an elevator bank or a curtain wall, that is the difference between an estimate and an informed estimate.

What it means for your next report

  • Expect to be asked about your objectives, timeline and risk tolerance before the site visit.
  • Expect the scope, and any limitations on it, to be stated more explicitly.
  • Check that a proposal names the edition. Lenders increasingly specify E2018-24, and a report citing the 2015 edition may be questioned.

Worth noting for owners and managers: ASTM has since begun work on a separate guide for facility condition assessments, on the reasoning that E2018 is built for transactions rather than long-term capital planning. If your purpose is capital planning, say so when you commission the work.

Financing or buying a commercial property?

We prepare ASTM-format property condition assessments for commercial, industrial and apartment buildings.

Request a Quote
About this article Written by Ben Engineering, which prepares reserve fund studies, depreciation reports, property condition assessments and environmental site assessments in Ontario and British Columbia. This is general information about regulatory and standards changes, not advice for a specific property. Requirements change — confirm the current position before acting.